Ukmeg315 KVA oil type transformerAnalysis Project
release time:2023-03-21 19:50:29

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Ukmeg,After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer,UkmegMining dry-type power transformer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Connection group structure of dry-type transformerMahanoro,(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.Sound in case of phase failureThe vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.


Ukmeg315 KVA oil type transformerAnalysis Project



On load commissioning:Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Which one is better, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.There are many connection groups of dry-type transformers and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.


Ukmeg315 KVA oil type transformerAnalysis Project



The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.Promise and keep promise,Before application, the sampling container shall be cleaned with vehicle gasoline soapy water or other organic solvents (such as trisodium phosphate) except oil stains,UkmegPower transformer energy consumption standard, and then washed with tap water until it is not alkaline,UkmegPower recovery transformer, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Ukmeg, rotate and release the oil in the tube to clean the sampling tube clearly put forward the glass test tube, carry out it twice, and then draw the oil sample.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

comment list
  • Jiatai Elevator Company

    Ukmeg315 KVA oil type transformer How's the market trend recently, do you know anything?

  • Xu Juan

    Feels of value for money, service attitude is very good, Ukmeg315 KVA oil type transformer workmanship is very good, nothing fussy, all five points

  • Self-support and agency import and export business

    I'm quite satisfied, and the quality and workmanship are even worse. Look back and introduce to friends

©2009-2024Metal Microblog  Sitemap