SemarangPower transformer recoveryMatters to prevent damage
release time:2023-03-22 09:44:17

When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.Oil immersed transformer companySemarang,Protection mode for type selection of dry-type test transformerDry type transformer manufacturerTorez,For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.The noise of dry-type transformer comes fromThe noise of dry-type transformer comes from


SemarangPower transformer recoveryMatters to prevent damage



Oil leakage of cast iron partsThe efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary the smaller the output power, the lower the efficiency.The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore it must also be changed to produce flexible connection.Supply chain quality management,Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below kVA and the working voltage is below KV,SemarangApplication of dry-type transformer, which also ensures the rated voltage of kV; Oil immersed transformers are generally suitable for distribution equipment.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window,Semarang125 KVA dry type transformer, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.


SemarangPower transformer recoveryMatters to prevent damage



The hanging core of dry-type transformer is a vital partDesign brand,Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, chemical enterprises and factories.Power saving analysis of transformerDue to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Semarang,Therefore, it is necessary to find the short-circuit fault point according to the fault situation,Semarang110kV transformer, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.& ldquo; YN, D & rdquo; in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).

comment list
  • coal sales

    SemarangPower transformer recovery Tell me a price, is there a detailed price for the parameter?

  • gold heart co., ltd.

    SemarangPower transformer recovery It’s good, the price is right, friends also say it’s good, it’s worth it

  • Cailang Media Company

    SemarangPower transformer recoveryHow much is it, can I transfer the goods?

©2009-2024Metal Microblog  Sitemap