ArezzoApplication scope of oil immersed transformerPromote sewage treatment
release time:2023-03-21 13:53:03

Method and process of taking oil sample of power transformerThe vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.Arezzo,Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person,Dry type transformer companyThe insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.For no-load impulse closing of transformer, pay attention to the following matters:


ArezzoApplication scope of oil immersed transformerPromote sewage treatment



The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃ the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, and the transformer shall be tripped quickly.In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer the overtemperature trip data signal must be transported to the secondary maintenance circuit, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.property right,What about oil immersed transformer fire?When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.


ArezzoApplication scope of oil immersed transformerPromote sewage treatment



It includes the performance and main uses of insulating layer materials, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip,ArezzoS11 type oil immersed transformer, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.Where to sell API,When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than % there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger,ArezzoPower supply transformer, the resistance value exceeds m ohm bus.Arezzo,For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage,ArezzoRated current of distribution transformer, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.Noise dispersion of dry-type transformer

comment list
  • Jiabei Children's Toys Company

    A good seller, even a novice, a lot of ArezzoApplication scope of oil immersed transformer don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a

  • Binhu Mingxuan Metal Products Co., Ltd.

    It is still affordable to buy things online, ArezzoApplication scope of oil immersed transformer I signed for two days late, but the things are really good, and the boss is good. The speed of transpor

  • Lever hoist

    The packaging ArezzoApplication scope of oil immersed transformer looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next tim

  • hoist

    I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After ArezzoApplication scope of oil immersed transformer a

  • Zhao Feng

    ArezzoApplication scope of oil immersed transformer It’s really good, how long does it take to arrive after the departure?

©2009-2024Metal Microblog  Sitemap