RigaParameters of 1000 KVA oil immersed transformerWhat principles should be paid attention to in the selection
release time:2023-03-21 16:45:55
RigaHow much is a 500 KVA box transformer,

The method and whole process of taking oil sample of power transformer are as follows:The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.Riga,Power saving analysis of transformerThe cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.Slatina,The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.& ldquo; YN D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand,RigaElectric box transformer, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.


RigaParameters of 1000 KVA oil immersed transformerWhat principles should be paid attention to in the selection



How to reduce the failure of dry-type transformer?The top and middle of the transformer oil tank,RigaPower plant step-up transformer, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Where is it, after opening the sealing cover, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipeNoise solution of dry-type transformerWiring mode of dry-type transformer:


RigaParameters of 1000 KVA oil immersed transformerWhat principles should be paid attention to in the selection



The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.manufacturer,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.Riga,Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.Careless maintenance and insulation damageFor the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

comment list
  • integrated circuit

    Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, RigaParameters of 1000 KVA oil immersed transformer basically satisfied.

  • City Park Parking Lot Operating Company

    It is very comfortable to do business with you. Responsible, serious, RigaParameters of 1000 KVA oil immersed transformer is also good, I must give you a good comment. Looking forward to the next coop

  • Kejiang Metallurgical Machinery Company

    I just received it in the morning and my friends like it very much. I will buy it from you next time RigaParameters of 1000 KVA oil immersed transformer.

©2009-2024Metal Microblog  Sitemap