BaturajaPrinciple of oil immersed power transformerRelated Standard Index
release time:2023-03-23 19:28:42

Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.Baturaja,Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage, large current flow and small characteristic impedance into high communication AC voltage,BaturajaTypes of dry-type transformers, small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core), causing the magnetic induction voltage in the primary coil (or current).After no-load test run is normal for h, it can be transferred to on-load operation,BaturajaCircuit transformer, and the load shall be gradually increased from %, % and % by grade.Asipovichy,Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?Causes of fire in power transformer


BaturajaPrinciple of oil immersed power transformerRelated Standard Index



On load commissioning:Several detection methods for installing transformerAfter hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.Analysis project,Oil immersed transformer operationThe tap changer of power transformer shall also have strong insulation. kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).


BaturajaPrinciple of oil immersed power transformerRelated Standard Index



The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, that is, the disconnection component of the electric field is small.Potential development,Causes of fire in power transformerHow to make up oil for oil immersed transformer?Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.Baturaja,When the power transformer operates at full load it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large,Baturaja500 kV oil immersed transformer, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Power transformer plantAnalysis of common faults of oil immersed transformer: