Denpasar Power transformer insulationContainer volume calculation method
release time:2023-03-22 09:49:30
Denpasar Capacity model of oil immersed transformer, if the second phase is blocked

When the transformer is out of phase, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;Denpasar ,The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.Shubarkuduk, the resistance value exceeds m ohm bus.After tightening the loose bolts and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.


Denpasar Power transformer insulationContainer volume calculation method



Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan,Denpasar Protection grade of oil immersed transformer, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment such as discoloration, deformation, offset, cracking, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire,Denpasar Oil sample test of oil immersed transformer, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.how, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.Oil leakage of porcelain pot and laminated glass oil level gauge


Denpasar Power transformer insulationContainer volume calculation method



Oil immersed transformerHonest management,The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Denpasar ,Dry type transformer companyThe clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.Power transformer manufacturer

comment list
  • Jinyuan Automobile Sales Co., Ltd.

    I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After Denpasar Power transformer insulation arrived, I was

  • Zhao Ming

    Can you give me a discount next time I buy it, Denpasar Power transformer insulation The quality is good, and I will live up to the boss

  • Compound fertilizer

    Finally got Denpasar Power transformer insulation So happy that! The workmanship is great.

  • Railway equipment manufacturing

    It is still affordable to buy things online, Denpasar Power transformer insulation I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also

  • Lu Yongbin

    It is very comfortable to do business with you. Responsible, serious, Denpasar Power transformer insulation is also good, I must give you a good comment. Looking forward to the next cooperation, I wis

  • Longhua North Ceramics Company

    Haha, Denpasar Power transformer insulation received! It's too late to confirm, sorry, the boss is very fashionable!

©2009-2024Metal Microblog  Sitemap