Spiegel KennethInstallation scheme of 35 kV oil immersed transformerDiversification of functions
release time:2024-04-24 17:00:58

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Power transformerSpiegel Kenneth, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change, cutting off the load current will cause arc burning between circuit breakers, tap power on and off or short circuit fault, so the dry-type transformer shall be powered off during regulation. Therefore, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; mm galvanized wire shall be wound over turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than .m.Ramble,It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.The noise of dry-type transformer comes fromSound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.


Spiegel KennethInstallation scheme of 35 kV oil immersed transformerDiversification of functions



Some are tied with plastic tape, and some immediately press the two edges together because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, and the grounding wire,Spiegel KennethAll transformers, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example,Spiegel Kenneth1600KVA transformer price, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.analysis,Solenoid insulation deteriorationThe key reason for oil leakage is that there are defects in cast iron partsNaturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.


Spiegel KennethInstallation scheme of 35 kV oil immersed transformerDiversification of functions



Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Create brillianceDry type transformer manufacturerPower saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact,Spiegel KennethS11 technical parameters of power transformer, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Spiegel Kenneth,When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

comment list
  • Power Quality Equipment

    Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, Spiegel KennethInstallation scheme of 35 kV oil immersed transformer basically satisfied.

  • Liu Naiyu

    Since the last time I bought your Spiegel KennethInstallation scheme of 35 kV oil immersed transformer, this new model has indeed met the standard and is very good, giving you a good comment.

  • soy products

    Follow you Spiegel KennethInstallation scheme of 35 kV oil immersed transformer for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second ti

  • Simmons spring wire

    To live up to the boss's expectations of me, I will definitely write down my own evaluation objectively, fairly and truthfully, Spiegel KennethInstallation scheme of 35 kV oil immersed transformer is

©2009-2024Metal Microblog  Sitemap