dehradun S13-m-200 power transformerBusiness development model needs to be changed
release time:2023-03-22 08:35:41

Dry type transformer manufacturerOutdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain snow, wind and sand.dehradun , observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition,dehradun Reactor and transformer, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.Abu Jibeha,When the power transformer operates at full load, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Noise pollution control and prevention measures of dry-type transformer& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.


dehradun S13-m-200 power transformerBusiness development model needs to be changed



The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,dehradun What is dry type power transformer, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety,dehradun Distribution transformer wiring group, otherwise it will have an adverse impact on life safety.With Vietnam and Malaysia China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.Encyclopedic knowledgeMethod and process of taking oil sample of power transformerAvoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Power transformer


dehradun S13-m-200 power transformerBusiness development model needs to be changed



Wiring mode of dry-type transformer:For more, please check, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.Protection mode for type selection of dry-type test transformerIn relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitdehradun ,Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Power transformerWhen the full load test is carried out and everything is normal, the load can be connected.

comment list
©2009-2024Metal Microblog  Sitemap