The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, the fast cutting device in the hole mainly consists of a fixed cutting device, a tension blade device and a cutting rotation device, [] the tension blade device is sleeved in the cutting rotation device, Screw threads are respectively arranged on the outer surface of the cutting rotating device and the upper end of the tension blade device. The tension blade device and the cutting rotating device are connected by threads. The end of the tension blade device protruding from the cutting rotating device is provided with a tension blade nut. The fixed cutting device is mainly composed of a cutting blade and a pulley. The cutting blade and the pulley are respectively connected on both sides of the cutting rotating device through slots, A flange plate and a bearing are arranged on the outer surface of the cutting rotating device, the quick cutting device in the hole is installed in the grouting pipe hole through the flange plate, and the fixed cutting device is connected with the grouting pipe flange plate through bolts. The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.OK or not?,If any crack is found, it shall be repaired in time, otherwise, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available,Kosalt NangoTunnel combined hollow anchor manufacturer, the method of hot vulcanization connection can be used.? The length can be matched according to the construction requirements, without loss.Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. Wed better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.
Can the stretching speed of grouting pipe be defined?Direct material, performance of grouting pipe the grouting pipe is light in weight, has strong bite force with soil or gravel, is acid-base resistant, corrosion-resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, and mechanical scars such as scratches and crushed stones will produce stress concentration, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.The chemical grouting method usually uses a pump to inject grout into the soil through a grouting pipe.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used,Kosalt NangoPipe shed and small conduit, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.Kosalt Nango, The saddle shaped curved surface on the horseshoe surface of the grouting pipe and the upper and outer molds are not well fitted, which is caused by the Chengdu grouting pipe manufacturers failure to smooth (flatten) the grouting pipe along the horseshoe surface.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness. The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.
The festival is coming soon, can Kosalt Nango42 * 4 small conduit be discounted?
Ask, can I send Kosalt Nango42 * 4 small conduit specific specifications, let me call you guys.
Yes, I hope to cooperate next time. Thank you boss~~ Fast delivery, Kosalt Nango42 * 4 small conduit basically satisfied.
Kosalt Nango42 * 4 small conduit The quality is very good, I bought it for the second time, the goods are good, the boss is very good
Support each other! Seeing you Kosalt Nango42 * 4 small conduit, we are preparing to place an order and hope to ship on time.
Can you give me Kosalt Nango42 * 4 small conduit detailed specification data?